2011-2012
|
Construction of new Flexible pavement, Re-construction/ Strengthening, Widening & Surfacing work at 24th (p) to 35th (p) and Construction of 2 (two) Nos. 6.00m x 4.50m RCC Box Culvert at 24th km (Gap no. 24/1) & 34th km (Gap no. 34/2) of Goripur-Kachua-Hazigonj-Ramgonj-Lakshmipur Road (Lakshmipur Portion) (Z-1422) under Lakshmipur Road Division during the year 2011-2012 |
2011-2012 |
Earth works & Pavement works. (Comilla-Lalmai-chandpur-Lakshmipur-Begumgonj Road) (Begungonj-Sonaimuri-Ramgonj Road) (Lakshmipur-Town old Section) (Lakshmipur Town Bridge-Tero Baki Road) (Muddafarganj-Chitosi-Ramgonj Road) (Hazigonj-Ramgonj-Lakshmipur Road) & (Lakshmipur-Dattapara-Chatkhil Road) |
2011-2012 |
DBS Wearing Course, Strengthening etc. (Lakshmipur-CharAlexander-Sonapur Road) |
2011-2012 |
Construction of 1 number RCC girder and 2 number PC girder bridge Repair of 1 number bridge LRP 027d in Lallmai-Chandpur Road (R-140) and construction of 1 number P.C Girdge bridge in Maijdee-Ragonj-Chandragonj Road (R-143) under EBBIP. |
2012-2013 |
Repair, Strengthening, Carpeting & Seal coat at 1st (p), 7th (p), 8th (p) & 9th (p) km of Mandari-Dasherhat Road and 15th km, 17th (p) to 20th km, 26th (p) & 30th (p) km of MIODNB Road Under Laxmipur Road (Z-1429) Division During the Year 2012-2013. |
2012-2013 |
Replecement of damaged 4.250m length & 4.00 m height RCC Box Culvert at LRP-016d, at LRP-017b, 2.50m length & 3.00 m height RCC Box Culvert at LRP-019b of MRCBC Road, 4.25m length & 4.00 m height RCC Box Culvert at LRP-096b of Comilla-Lalmai-chandpur-Lakshmipur-Begumgonj Road . |
2013-2014 |
Periodic Maintenance Programme (PMP) providing DBS Wearing Course work in/c. Strengthening, Potholes, repair and earth work in 10.50km of Bhola-Barishal-Laharhat road (N-809) And Providing Overlay/DBST work in 17.70km. & 4.15km of Comilla-Lalmai-chandpur-Lakshmipur-Begumgonj Road (R-140). |
2014-2015 |
Strengthening and Widening of flexible Pavement with DBS Wearing Course & Protective work at 36th km (P), 37th km & 38th km (P) of Hazigonj-Ramgonj-Lakshmipur ROad (Z-1422) under Lakshmipur Road Division during the year 2014-2015 |
2014-2015 |
Base repair of damaged section of road by base type-II and DBS overlay work at 44th, 46th, 47th, 48th, 49th, 53rd, 54th and 55th of Lakshmipur-CharAlexander-Sonapur Road. (Noakhali) road (L. portion) (Z-1405) under Lakshmipur Road Division during the year 2014-2015. |
2015-2016 |
Earth work, Strenthening, DBS Wearing Course, Pavement work, Construction of Culvert, Protective work, Construction of Drain, Sign, Signal, Km Post instalation work from Ch.24+467 to 32+467 at Chandpur-Nanupur-Chandra-Kamtabazar-Ramgonj Road (Z-1412) under Lakshmipur Road Division during the year 2015-2016. |
2015-2016 |
Earth work, Strengthening, Carpeting, Seal Coat, DBS Wearing Course, Pavement work, Construction of 02 Nos, Culvert (1.00m. x 1.00m. x 10.25m.) Protective work, Construction of Drain, Sign Signal km Post installation work from Ch. 0+000 m to 8+000m at Paniwala Bazar-Dashgoria Bazar Road with link to Battra Bazar Road (Z-1436) and Char Alexander-Ramgoti Road (Z-1413) ch. 6+000m to 14+000m under Lakshmipur Road Division during the year 2015-2016. |
2015-2016 |
DBS Wearing Course work including Earth work & Repair from Ch.113+000 to 114+300, Ch.115+200 to 119+200, Ch. 120+000 to 121+250, Ch.122+000 to 124+350 & 125+000 to 127+950 of C-L-C-L-B Road (R-140) under Lakshmipur Road Division during the year 2015-16. |
2015-2016 |
i) Protective work & DBS work at from Ch. 10+250m to 15+000m of Chatkhil-Chandragonj Road (Z-1426) under PMP under Road Division, Lakshmipur during the year 2015-2016 ii) Protective worik & DBS work at from ch. 0+000 to 9+650 of Nalgara (Raipur-Faridgonj)-Kamarhat-Ramgonj Road (Z-1466) under PMP under Road Division, Lakshmipur during the year 2015-2016 iii) DBS work at 1st to 8th km ch. 0+000 to 8+000 of Chatkhil-Chitoshi-Shaharasti (Kalibari) Road under PMP under Noakhali Road Division during the year 2015-2016 |
2015-2016 |
Construction of 24.40m long PC Girder Bridge (in/c 7.00m x 2 Approch Slab) at 1st km (Ch. 0+690m) of Lakshmipur Town Connection Road (R-145) under Lakshmipur Road Division during the year 2015-2016.
|